Realising Optimal Energy Consumption via Enhanced iCON® Utility Optimiser (iUO 2.0)

Authors

  • Azleen Azna Mohd Khairil Hing Group Technical Solutions (GTS) PETRONAS Author
  • Fadzrul Izwan Muhd Ali Group Technical Solutions (GTS) PETRONAS Author

Keywords:

Simulation, modelling, steam system, industrial application, energy

Abstract

iCON® utility optimiser (iUO) was frst introduced in PETRONAS in 2010, and it has been extensively utilised in energy review studies across PETRONAS’ downstream processing plants. The tool is the frst in PETRONAS to use the frst principal steady-state simulation with customised unit operations to perform mass and energy balance of a steam plant. An enhanced version of the optimiser, iUO 2.0, was released in 2019, ofering much-improved robustness, accuracy, and fexibility. The software enhancements focused on three objectives: increased robustness, improved accuracy, and enhanced applications. Greater robustness and speed are achieved by auto-generating the property package and the migration from source original point (SOP) objects to script-based unit operations. Accuracy is enhanced by ofering more specifcation handles for the user to benchmark against the actual operation. These include specifcations for efciency, energy loss, heat rate with a correction factor, compression/expansion ratio, vendor performance customisation for GTG, and a sectionalised section for boiler and HRSG. Enhanced applications of the unit operations include linking to historian data and plant monitoring of the specifc equipment for modelled variables such as equipment efciency. Efcient and timely utility equipment monitoring will allow improved productivity and operational efciencies at the site. Plantwide steam network modelling allows a structured review of optimisation opportunities of the steam network system as a whole. The enhancements in iUO 2.0 promise a better realisation of the targeted beneft from desktop modelling to site implementation; and improve its readiness for future digital transformation and implementations. This paper showcases 3 example applications of iUO 2.0 using a gas turbine, HRSG, and a plantwide example case to demonstrate the robustness and opportunity evaluation for a utility plant optimisation.

Downloads

Published

2026-09-20