Process Design Challenges in Producing Clean Fuels Projects in Brownfield Refinery

Authors

  • Siti Fauzuna Othman Group Technical Solutions (GTS) PETRONAS Author
  • Hasinah M Hanafi Group Technical Solutions (GTS) PETRONAS Author
  • Nur Baizurah M Zamry Group Technical Solutions (GTS) PETRONAS Author
  • Azuria Camalia Kamel Group Technical Solutions (GTS) PETRONAS Author

Abstract

In Asia, with increasing pressure to meet environmental Diesel Euro 5 fuel specifcations, older refneries have the choice of upgrading their plants to prepare for this change. Changes that have to be thought of are not limited to the technology to be selected. Still, the more complex issues would be the brownfeld elements, plot constraints, utilities, and ofsite constraints. Older refneries will face a dilemma in meeting the more current design standards, especially those related to safety. Another key consideration is to scope the project’s boundary, which has to be considered is the brownfeld process unit limitations. The obsolete plant documents are also another challenge. Test run data has to be obtained to defne the plant’s current performance and determine the current efciencies of the equipment instead of assuming the equipment as new. This report provides insight into the challenges faced in designing old plants to meet Euro 5 requirements.

Downloads

Published

2026-09-20